SYSTEM OVERVIEW
The Ecomatic HS2102 is a weather responsive control that is designed for residential
heating systems with a single type of radiation, such as fin tube baseboard, panel radiators,
or cast iron radiators. It can also be used to control and prioritize an indirect fired domestic
hot water tank.
The control provides the following features:

Boiler water temperature modulation based on outdoor temperature.

Domestic hot water priority.

7-day programmable clock.

Daytime and nighttime temperatures.

Room temperature compensation with optional BFC room sensor.

Manual override switches for emergency operation.

Freeze protection for heating system; constant circulation in nighttime below freeze
temperature.

Freeze protection for indirect hot water tanks; maintenance tank at a minimum of
50°F (10°C) in night mode.

Malfunction display for system troubleshooting.

Standard non-adjustable 100°F/104°F pump logic for condensate protection of the boiler.

Pump kick during vacation and summer operation; the control will operate pumps for
1 minute at 12:00PM every Wednesday to prevent pump seizure.
The
“Service Manual - Ecomatic HS 2102”
will include all information necessary to mount, wire, and
place the Ecomatic control into operation. The settings described in this manual are intended for use by the
heating contractor.
To change settings such as the time, date and heating program, please refer to the
“Operating Instructions -
Control panel HS 2102”
. This manual will allow the homeowner to customize the control to their needs.
NOTE:
This manual is for reference only. The manual does NOT purport to address all design,
installation and safety considerations. It is the responsibility of the user of this manual to
determine the applicability and safety of each individual application and ensure its
compliance with local building codes.
It is expected that the user/installer is a licensed heating contractor with knowledge of
accepted industry practices for the installation and maintenance of the equipment and
various applications of the equipment involved.
2
TABLE OF CONTENTS
1
Mounting Instructions
4
2
Program Overview
6
3
Key Code
7
4
Installation Entries
8-18
5
Relay Test
19
6
Testing the Manual Reset High Limit (STB)
20
7
LCD Test
21
8
Heating Curve Display
22
9
Version Number
23
10
Troubleshooting Procedures
24
11
Reset
25
12
Sensor Curves
26-27
13
Wiring Diagrams
28-29
3
1 Mounting Instructions
Remove the front panel of the boiler.
• Only necessary with G124X and G224
Remove the two screws and housing from the top of
the Ecomatic.
Insert the two front feet of the control
into the holes provided on the top of the
boiler. Then, firmly push down on the
rear of the control until it snaps into place.
Fasten the control to the boiler jacket
using the two screws as shown.
The sensor bundle consists of one thermistor (FK), two
capillaries and a spacer. Mount the sensors per the following
boiler specific instructions.
G115, G205, G305:
Replace brass well with chrome
Ecomatic well. The sensor bundle should be inserted
into the Ecomatic well.
G124X:
Unwrap the sensor bundle. Remove spacers from
the chrome well on the boiler. The high limit (STB) capillary
and temperature sensor (FK) should be inserted into the
chrome well with existing Honeywell Aquastat. The
remaining capillary should be mounted to the supply
manifold and thoroughly insulated.
G224:
The tridicator assembly should be moved to the
supply piping and replaced with the chrome plated Ecomatic
well. The sensor bundle should be inserted into this well.
4
Mounting Instructions
1
Electrical connections must be made according to
the wiring diagram (See pages 28-31).
All the wires should be routed through the cable
raceway at the rear of the boiler. Rear panel jacket
may be modified per local code.
Use the white strain reliefs provided to lock all cables
into place on the back of the control.
Tilt the display to the desired position.
Replace the top housing of the control and fasten
the two screws. The control is ready to be placed
into operation.